Scorecard and Umbrella Holder Assembly Instructions

Scorecard and Umbrella Holder Assembly Instructions

Scorecard/Umbrella Holder
Assembly Instructions
1. Unpack and Check Parts


a. Mounting Bracket 
b. Allen Wrench 
c. Scorecard Holder & long Mounting Screw
d. Umbrella Holder & short Mounting Screw

2. Open Mounting Bracket by loosening 2 Screws with Allen Wrench


3. Affix Mounting Bracket to Frame with 2 screws and allen wrench (approximately 2” below handle) with umbrella holder fixture wheel on left and scorecard holder receptor on right (see picture)


4. Assemble Umbrella Holder and Scorecard Holder with Mounting Screws. Adjust Angle as desired.